NASASpaceFlight.com published the results of current NASA thinking concerning what needs to be launched and when to support a crewed mission to Phobos and two crewed missions to the Martian surface between 2033 and 2043.
The result is a mind-numbingly complex operation involving dozens of launches to cis-lunar space and Mars using the heavy lift Space Launch System.
The architecture includes a collection of habitation modules, Mars landers, propulsion units (both chemical rockets and solar electric propulsion) and other parts of a Mars ship.
http://shekinahfellowship.blogspot.com/2014/03/space-suits-and-such.html
http://shekinahfellowship.blogspot.com/2015/04/moon-fables-and-other-stuff-of-interest.html
http://shekinahfellowship.blogspot.com/2013/08/not-ever-gonna-happen.html
No comments:
Post a Comment